2n2sale160ad |
Wysłany: Nie 8:13, 19 Gru 2010 Temat postu: ugg boots On building design and construction of U |
|
On building design and construction of UPVC drainage problems should be noticed
Health and sanitary seal easily be destroyed, the harmful sewer odors into the household indoor living environment affect people's health, the correct approach is to set the ramp links here. 3,3 drain noise and the mitigation measures in the use of UPVC drain people think noisy, UPVC pipe noise test at the bottom than the cast iron drain pipes large 2 ~ 3dBfA), and no more than the state living standards for environmental noise requirements. Users on this issue reflects the larger reasons: First, by the new environment a process of adaptation,ugg boots, the sound room space under the action of at resonance, so that the sound enhanced; Second, the designer did not use the appropriate technical measures. Therefore, as far as possible in the design of the drainage stack away from the bedroom and living room. Some households only consider the layout of the room space is reasonable and does not consider the use of water supply and drainage functions. Special attention in the construction of the riser to the bottom of the discharge pipe junction with the technical requirements, click \the first connection and the bottom of the riser set buttress to prevent the settlement 『l1.\The riser flow into effect so, so that the impact of noise reduction. Can also take technical measures, such as holding the bottom riser card into the some of the inside of rubber pad. Without prejudice to prevail telescopic riser, so that part of the pipeline can reduce or eliminate the effects of noise. 3.4UPVC tube junction with the roof leaking problem UPVC drainage pipe outer wall surface finish higher, often through the floor of the junction due to small stones with mortar and pipe wall is not good, leaving along the wall between the upper and lower layers leaking. The general practice is: with emery cloth to the skin in the binding site risers polished to make the skin rough, this approach due to a larger workload and polished uniform. Difficult to grasp the severity of the depth. By comparing the actual project, using a good job in the Department of identity with the riser, the brush on a layer of plastic binder. To be the formation of a thin plastic sheath end solution layer, a layer of sand on the roll,uggs bestellen, after solidification, the plastic tube to form a rough surface. Standpipe and then plugging holes with fine aggregate concrete. Hole blocking material selection and the concrete floor of the beans with the label stone concrete, the additional amount of water repellent and expanders, plugging holes will require reinforced concrete vibrating rod compaction. Civil engineering construction decoration, high in the pipeline to do around the 50mm, 50mm diameter larger than the level of the water table pier. Pipe through the floor at the construction sites require a higher use of sealing rings, sealing rings glued to the riser, and be hit concrete. Increase the joint surface and water leaks crawling distance. The experiment, the sealing ring also do sticky sand. During the construction process. The toilet \3.5UPVC drain trap problems rely on the drainage system on the water seal to prevent the risk of odor. The plastic drain the water resistance is small, the role of water in the suction pipe can easily be damaged seal. Dry climate in northern China, water evaporates quickly, seal height should be maintained at between 50-100mm. In the matching P-type or S-trap, the middle of a short length of pipe socket length to go through the calculations to determine together. Too deep for too long will cause the water seal, water poor, prone to sedimentation clogging. Too short and can not guarantee a high degree of seal, causing odor on the take. 4 summarizes the installation of UPVC pipe is a unique technology, strong technical work,ugg boots Günstig, the construction unit should install before installing the technical training of personnel,uggs, basic grasp of the characteristics of plastic pipe and the installation process required before appointment, it will ensure that Installation of UPVC pipe quality. UPVC drainage pipe on the technical characteristics of products between the practice of learning and a model of UPVC drainage pipe installed to further supplement and improve the construction process, figuring out the design intent. Acceptance of strict implementation of standards for construction quality, strengthen quality control, and actively promoting the \Reduce or eliminate the quality problems, so that the construction project to obtain satisfactory results.
相关的主题文章:
ugg Günstig Subway station monitoring and analysi
ugg boots New belt conveyor rollers _690
moncler sale Project price contract for small and |
|